"This measure will make it possible to dramatically ease the situation with the electricity supply," the report said. Electricity from this converting station is used in three northeastern provinces of China - Heilongjiang, Liaoning and Jilin. In 29 years, Russia supplied over 30 bln kilowatt hours of electricity, according to the channel.
The Amur-Heihe overhead transnational power line was constructed for increasing electricity exports to China. It was commissioned in 2012. Its maximum capacity is 750 MW.
Source https://tass.com/economy/1344259
To remove first post, remove entire topic.
Tasks reports Russia will amp up exports .
"This measure will make it possible to dramatically ease the situation with the electricity supply," the report said. Electricity from this converting station is used in three northeastern provinces of China - Heilongjiang, Liaoning and Jilin. In 29 years, Russia supplied over 30 bln kilowatt hours of electricity, according to the channel.
The Amur-Heihe overhead transnational power line was constructed for increasing electricity exports to China. It was commissioned in 2012. Its maximum capacity is 750 MW.